ADNOC Gas plc announced today that Worley Engineering Pty Ltd has been awarded the Front-End Engineering and Design (FEED) contract for new gas processing facilities at Bab Gas Cap (BGC), Emirates News Agency reported.
The new facilities would boost ADNOC Gas’ current processing capacity by 20% or over 1.8 billion standard cubic feet per day (scfd) with a Final Investment Decision (FID) expected in 2026.
The project’s processing facilities will be designed to optimise production of natural gas liquids
The facilities will receive hydrocarbons from an innovative development of the Bab field. Following advanced field development studies and leveraging state-of-the-art technologies, ADNOC has enabled the simultaneous development of oil and gas within the field whilst unlocking a potential production of 1.5 BCFD of gas and 80 MBD of condensate.