According to the PR Office of National Iranian Gas Company (NIGC), the project to build the Iranshahr-Chabahar-Konarak gas transmission pipeline, in south Sistan and Baluchestan province and with a length of 300 km, is ongoing and made 25% headway.
he contract to install Iranshahr- Chabahar gas transfer pipeline – an extension of IGAT VII, was signed in April 2018, between Iranian ministries of oil and defense.